Can’t say that Fly’s been a pretty sight sitting neglected for too long, but Twig came up yesterday morning and we made a start to putting her right. So we built a tarpaulin frame from Alkathene water pipe, then I finished it off with some smaller white overflow pipe and guy lines before taking the pressure washer to the worst of the grime on topsides and deck. Still want to get the deck properly scrubbed before fitting the cover, after which we need to lift out the engine for blasting/repainting, clean the insides (never my favourite job, and least of all now!), fit the new forehatch, replace the leaking windows and get to work on the delaminated bunk tops. But at least it’s a start, she’s looking better already and that’s something to feel good about…
Still not recovered enough from the rib injury to think running or climbing a good idea, but hoping to take my camera for a walk somewhere this afternoon (a cracking day, as shown by the photos of Fly) to get my first real exercise for three weeks. So it’s a fair road back for Fly and a bit yet for me, but we’ll both get there! :-)
[…] exactly rapid progress with so much else going on but, three weeks after building the tarpaulin frame for Fly, the decks are 95% clean (approx. six hours of hard scrubbing to test my ‘recovered’ […]
Pingback by Undercover Fly « Petestack Blog — 18 October 2010 @ 3:06 pm